PREPARATIONS: 20 DAY PLAN TO 15 DAY EXECUTION
DAY -2 :-
Crash barrier 200 cum 200 Cum 5765 •Jaw 03 NMRCL
removal Crusher – & M/s
1no. NCC
Crushing of 290Cum 290 Cum 6055 •Jaw 06 NMRCL
Girder in central Crusher – & M/s
Span no 2. 2 no. 06 NCC
•Diamon
d floor
saw -02
nos.
Ramp removal 4800 4800 Cum 10855 •Excavato 16 NMRCL
middle 1/2 Cum r -08 no & M/s
layer- North and •Dumper 100 NCC
South end 50 nos.
Respective 275 Cum 275 Cum 11130 •Jaw 06 NMRCL
exposed top RE Crusher - & M/s
wall crushing 2 no. 02 NCC
•Jet
Blower –
01 No.
DAY -3 :-
Crushing of 290 Cum 290 Cum 11420 •Jaw Crusher 4 12 NMRCL &
central Span no 3 nos. 06 M/s NCC
•Diamond floor
saw -02nos. 02
•Jet blower –
01 no.
Cutting with wire 7 Cum 7 cum 11427 •Diamond wire 02 NMRCL &
saw of saw 1 nos. M/s NCC
Diaphragm 1 in •Crane 1 nos. 02
small pieces and
lowering of cut
pieces
Ramp removal 4800 Cum 4800 16227 •Excavator 4 08 NMRCL &
top 3/4 th layer - Cum nos. 100 M/s NCC
North and South •Dumper 50
end nos.
Respective 275 Cum 275 Cum 16502 •Jaw Crusher 06 NMRCL &
exposed top RE 2 nos. M/s NCC
wall crushing
34
NAGPUR METRO RAIL CORPORATION LIMITED: A JOINT VENTURE OF