Page 35 - SWD Safety & Health Handbook
P. 35

location and fill out an “OUT OF SERVICE” tag. Place this lockout
                                      tag on the start button.

                              4-203   LOTO on systems only after receiving arc flash training.  When
                                      operating disconnects (LOTO), wear the appropriate arc flash PPE
                                      according to the applicable arc flash label.  ALWAYS stand to the
                                      side of the disconnect (NEVER stand directly in front).  Use your
                                      hand to pull the disconnect switch to the “OFF” position, look away
                                      and hold your breath.  NEVER stand directly in front of the
                                      disconnect switch when operating  disconnect switches  to either
                                      the “OFF” or “ON” position.

                              4-204   With the disconnect switch in the “OFF” position, attach your
                                      personal safety LOCK and TAG and place the key(s) in your
                                      pocket.  Do not give your key(s) to anyone.   If there is potential for
                                      more than one person attaching a lock/tag, ALWAYS place the
                                      hasp on the disconnect first. Only five locks are permitted on one
                                      hasp. If more than five employees are working on the equipment,
                                      a second hasp is required.

                              4-205   Before working on any equipment that you have locked out and
                                      tagged out (LOTO), TEST the equipment for safety. Try to start the
                                      equipment at the particular stop/start station or control panel.  If
                                      more than one person is required to LOTO, a designated and
                                      trained employee is required to test the equipment. All others are
                                      to confirm the testing procedure was followed.  After testing,
                                      ensure the control switch is placed in the off position.
                                      IMPORTANT:  Testing the start equipment from computer
                                      control system shall be done by a designated and trained
                                      employee.

                              4-206   LOTO equipment that feeds to and discharges from the equipment
                                      that is under repair. Obtain additional locks and tags at your LOTO
                                      station or from your supervisor if needed.

                              4-207   When work on a piece of equipment is not complete, the
                                      supervisor must be informed before the last person removes his or
                                      her lock. The supervisor must then replace the lock with his or her
                                      own LOTO.

                              4-208   No employee may remove another employee’s lock and tag.
                                      Only a supervisor may remove an employee’s lock and tag.
                                      Vulcan allows removal only after repeated and documented
                                      attempts to locate the employee. In such cases, a supervisor must
                                      complete a “Master Key LOTO Removal Record.”

                              4-209   Call a qualified electrician to disconnect equipment that cannot be
                                      locked out. E-stops/pull cords shall not be used as a means of
                                      disconnect.

                              4-210   On major construction projects (not repair and maintenance) the
                                      following must have LOTO on the appropriate disconnects for the
                                      duration of the project:
                                                           33
   30   31   32   33   34   35   36   37   38   39   40