Page 39 - TopWinder®
P. 39

®
                                         ®
                       TopWinder



                       Installation
                       Loading the ShineMitt™ onto the Hub Assembly

                       9)  Apply dielectric grease to the receptor on the LED. Align the indicators on the LED Receptor and
                          the Wire Harness Plug and press them together gently so the pins do not get bent.


                     Step 9:
                     Align tabs on
                     connectors and                                                                 Step 10:
                     press together                                                                 Carefully feed the
                     gently. Wrap                                                                   Wires thru the
                     connection with                                                                End Plate Holes
                     electrical tape.                                                               into the Hub.




                       10) Carefully feed the wire connections through the End Plate Holes and into the Hub Assembly.

                       11) Apply Red Loctite 271 to the End Plate Fasteners and reassemble the End Plate back onto the
                          Hub Assembly.



                                                                                                      Step 12:
                                                                                                      Secure the LED
                                                                                                      Wires to the End
                                                                                                      Plate with the
                                                                                                      Clamps.

                      Step 11:
                      Apply Red Loctite 271 to
                      the End Plate Fasteners.


                       12) Secure the LED Wires to the End Plate with the plastic Clamps, refer to image above on right.

                       13) Apply Anti-Seize™ to the Hub Cap Fasteners and reassemble the Hub Cap back onto the Hub
                          Assembly.














                                     Fully Loaded Top Wheel
                                       with ShineMitt™
                                                                              Step 14:
                                                                              Apply Anti-Seize™ to the
                                                                              fasteners and reattach the Hub
                                                                              Cap to the Hub Assembly.
                       1MANUL755            Belanger, Inc.® * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        35
   34   35   36   37   38   39   40   41   42   43   44