Page 1547 - Foton Workshop Manual - Auman EST-M
P. 1547

Electrical system – electrical components                EL - 123

                                                                                                                  IN


                                                        7. Installing the air heater assembly
                                                                                                                  DI
                                                        a. Put the warm air water tank into the right place.

                                                        b.  Tighten  the  fixing  screws  for  the  warm  air  water  tank
                                                        cover.                                                    EG

                                                                                                                  TR


                                                                                                                  AX
                                                        c. Tighten the fixing screws for the warm air water tank hold
                                                        down plate.
                                                                                                                  FR
                                                        d. Install the transition air duct.


                                                                                                                  ST


                                                                                                                  BR


                                                                                                                  BW
                                                        e. Install the fixing screws for the air heater assembly.


                                                                                                                  EL







              8.  Install  the  warm  air  and  A/C  assembly  (refer  to  “Chapter  EL  Electrical  System  -  Electrical
              Components - Warm Air and A/C, Replacement”)
              9.  Install  the  instrument  panel  assembly  (refer  to  Chapter  BW  body-instrument  panel,  combination
              instrument, ashtray-instrument panel, replacement”)

              10. Fill in coolant (refer to Chapter EG engine part-engine-cooling system-coolant, replacement”)

              11. Connect the cable of battery negative pole













                                                          EL-123
   1542   1543   1544   1545   1546   1547   1548   1549   1550   1551   1552